{"id":693,"date":"2026-09-07T05:06:03","date_gmt":"2026-09-07T05:06:03","guid":{"rendered":"https:\/\/www.oneplan.io\/articles\/public-market-layout-plan"},"modified":"2026-09-07T05:06:03","modified_gmt":"2026-09-07T05:06:03","slug":"public-market-layout-plan","status":"publish","type":"post","link":"https:\/\/www.oneplan.io\/articles\/public-market-layout-plan","title":{"rendered":"Public Market Layout Plan: Zoning, Dimensions, and Design"},"content":{"rendered":"<p><em>Written by: Paul Foster, Founder, CEO, OnePlan<\/em><\/p>\n<h2 id=\"key-takeaways\">Key Takeaways<\/h2>\n<ul>\n<li>Public market layout plans balance vendor stall space, customer circulation, health and safety compliance, and accessibility within one coordinated floor plan.<\/li>\n<li>Clear zoning separates wet food, dry food, ready-to-eat, and service areas to reduce contamination risk and simplify daily operations.<\/li>\n<li>Standard aisle widths range from 4\u20135 m for main circulation to 0.9 m minimum for accessible routes, supporting peak-hour flow and emergency egress.<\/li>\n<li>Stall dimensions, utility placement, and service corridors work best when coordinated from the earliest design stage to avoid costly retrofits and code issues.<\/li>\n<\/ul>\n<h2>What Is A Public Market Layout Plan?<\/h2>\n<p>A public market layout plan is a to-scale spatial diagram that organizes vendor stalls, circulation routes, utilities, and support facilities within a market building or site to support safety, functionality, and vendor success. It serves as the primary reference document for construction, permitting, health and safety compliance, and ongoing operations management.<\/p>\n<p>A well-executed layout plan directly affects vendor revenue by maximizing visibility and customer access. It reduces contamination risk through deliberate zoning and supports emergency evacuation by maintaining clear egress routes. It is an operational document with measurable consequences when its dimensions are wrong, not a decorative floor plan.<\/p>\n<h2>Key Zones In A Public Market Layout<\/h2>\n<p>Market zoning typically groups wet food, dry food, ready-to-eat food, non-food items, and live poultry slaughter areas into separate areas, each with clear signage. This framework reflects internationally recognized hygiene and contamination-prevention principles used across many market types. Always verify applicable zoning requirements with your local health authority and building code, because standards vary by jurisdiction.<\/p>\n<p>The five primary zones in a public market layout are:<\/p>\n<ul>\n<li><strong>Wet Zone:<\/strong> Fish, seafood, poultry, and fresh meat stalls. Wet food areas are typically equipped with water supply installations, drainage, and sanitation facilities. Surfaces must be washable and corrosion-resistant. <a href=\"https:\/\/id.scribd.com\/doc\/263485268\/SNI-8152-2015-Pasar-Rakyat\" target=\"_blank\" rel=\"noindex nofollow\">Sales tables in food zones must be a minimum of 60 cm (approximately 24 inches) from the floor<\/a>.<\/li>\n<li><strong>Dry Zone:<\/strong> Produce, packaged goods, grains, spices, clothing, and crafts. Dry food and non-food areas stay dry and protected from moisture, which justifies their physical separation from wet zones.<\/li>\n<li><strong>Food Court \/ Eating Area:<\/strong> Prepared food stalls and customer seating. Cooked-food vendors require greater separation from raw food handling areas, safe fuel storage or electric supply, handwashing access, and dedicated waste handling.<\/li>\n<li><strong>Live Poultry Slaughter Area:<\/strong> Where applicable, a fully segregated zone with dedicated drainage, containment, and signage.<\/li>\n<li><strong>Administrative And Service Areas:<\/strong> Management office, restrooms, storage, waste handling, and loading bays. Operational efficiency improves when loading bays, delivery areas, administration offices, toilets, maintenance facilities, storage, waste disposal areas, and materials recovery facilities appear in one coordinated layout. These functions work best near service entries, away from primary customer circulation.<\/li>\n<\/ul>\n<p>The rationale for wet and dry separation includes hygiene, drainage requirements, odor control, and contamination prevention. Clustering food vending near water, drainage, seating, and waste collection points supports hygiene and simplifies servicing. Dry and non-food zones then remain protected from moisture and odor.<\/p>\n<h2>Standard Aisle Widths For Public Markets<\/h2>\n<p>Circulation hierarchy is one of the most consequential decisions in a public market layout plan. Aisle widths determine peak-hour flow, emergency egress capacity, and accessibility compliance. The following table summarizes standard aisle dimensions drawn from general planning practice and the 2010 ADA Standards for Accessible Design. Always confirm applicable standards with your local authority, because requirements vary by jurisdiction.<\/p>\n<table>\n<thead>\n<tr>\n<th>Aisle Type<\/th>\n<th>Metric Width<\/th>\n<th>Imperial Width<\/th>\n<th>Standard \/ Source<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Main aisle (primary circulation)<\/td>\n<td>4\u20135 m<\/td>\n<td>13\u201316 ft<\/td>\n<td>General planning practice for two-way foot traffic and emergency access<\/td>\n<\/tr>\n<tr>\n<td>Secondary aisle (browsing between stall rows)<\/td>\n<td>2\u20133 m<\/td>\n<td>6.5\u201310 ft<\/td>\n<td>General planning practice<\/td>\n<\/tr>\n<tr>\n<td>Service corridor (vendor loading, waste removal)<\/td>\n<td>1.8\u20132.5 m (Type I\u2013II markets)<\/td>\n<td>6\u20138 ft<\/td>\n<td>General planning practice<\/td>\n<\/tr>\n<tr>\n<td>Minimum accessible route (ADA)<\/td>\n<td>~0.9 m<\/td>\n<td>36 in<\/td>\n<td>2010 ADA Standards, Section 403.5.1<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><a href=\"https:\/\/id.scribd.com\/doc\/263485268\/SNI-8152-2015-Pasar-Rakyat\" target=\"_blank\" rel=\"noindex nofollow\">SNI 8152:2015 specifies minimum corridor widths of 1.8 m for Type I (over 750 traders) and Type II (501\u2013750 traders), 1.5 m for Type III (250\u2013500 traders), and 1.2 m for Type IV (fewer than 250 traders).<\/a> <a href=\"https:\/\/mh-usa.com\/mobile-shelving\/ada-accessible-aisle-planning-mobile-shelving\" target=\"_blank\" rel=\"noindex nofollow\">The 2010 ADA Standards require a 60-inch (1.5 m) diameter circular turning space and mandate passing spaces at intervals of no more than 200 feet on routes narrower than 60 inches<\/a>. <a href=\"https:\/\/id.scribd.com\/doc\/263485268\/SNI-8152-2015-Pasar-Rakyat\" target=\"_blank\" rel=\"noindex nofollow\">General planning practice also requires wheelchair access for Type I and II markets<\/a>.<\/p>\n<h2>Market Stall Layout: Sizing And Patterns<\/h2>\n<p>Stall dimensions vary by product type and the operational requirements of each zone. The following table provides typical sizing benchmarks. Confirm applicable minimums with your local planning authority.<\/p>\n<table>\n<thead>\n<tr>\n<th>Stall Type<\/th>\n<th>Typical Dimensions (Imperial)<\/th>\n<th>Typical Dimensions (Metric)<\/th>\n<th>Source \/ Notes<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Dry goods \/ artisan<\/td>\n<td>10 \u00d7 10 ft<\/td>\n<td>3 m \u00d7 3 m<\/td>\n<td>General planning practice<\/td>\n<\/tr>\n<tr>\n<td>Wet goods (fish, meat, seafood)<\/td>\n<td>13 \u00d7 20 ft<\/td>\n<td>4 m \u00d7 6 m<\/td>\n<td>Larger footprint to accommodate drainage channels, display, and washable surfaces<\/td>\n<\/tr>\n<tr>\n<td>Food court vendor<\/td>\n<td>10 \u00d7 13 ft<\/td>\n<td>3 m \u00d7 4 m<\/td>\n<td>Plus additional seating area; stall dimensions should reflect what is actually sold<\/td>\n<\/tr>\n<tr>\n<td>Outdoor market stall (standard depth)<\/td>\n<td>13 ft depth<\/td>\n<td>3.95 m depth<\/td>\n<td>General planning practice<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><a href=\"https:\/\/id.scribd.com\/doc\/263485268\/SNI-8152-2015-Pasar-Rakyat\" target=\"_blank\" rel=\"noindex nofollow\">General planning practice sets minimum trading space at 2 m\u00b2 for Type I\u2013III markets and 1 m\u00b2 for Type IV markets<\/a>. This requirement establishes a regulatory floor rather than an operational optimum.<\/p>\n<p>Beyond individual stall sizes, the arrangement of stalls into patterns determines circulation and vendor visibility. Three primary layout patterns are used in public market floor plans:<\/p>\n<ul>\n<li><strong>Linear (single-loaded aisles):<\/strong> Stalls line one or both sides of a single corridor. This pattern is simple to navigate and easy to service. However, it limits vendor density and can create dead ends.<\/li>\n<li><strong>Grid (multiple parallel aisles):<\/strong> Stalls arranged in rows with intersecting aisles. This pattern maximizes vendor count and customer exposure. However, it requires careful aisle-width planning to prevent bottlenecks at peak hours.<\/li>\n<li><strong>Island (central blocks with perimeter circulation):<\/strong> Stall clusters surrounded by circulation routes. This pattern supports high visibility from multiple directions and works well for wet zones that need perimeter drainage access. It also demands more total floor area.<\/li>\n<\/ul>\n<p>Accessibility requirements apply regardless of layout pattern. <a href=\"https:\/\/mh-usa.com\/mobile-shelving\/ada-accessible-aisle-planning-mobile-shelving\" target=\"_blank\" rel=\"noindex nofollow\">The 2010 ADA Standards require a 60-inch (1.5 m) diameter circular turning space and a minimum 36-inch (0.9 m) clear aisle width on accessible routes<\/a>. Wheelchair-accessible stalls must accommodate these turning circles within or immediately adjacent to the stall footprint.<\/p>\n<h2>Utilities And Service Access In Market Layout Design<\/h2>\n<p>Utility planning must be coordinated with the spatial layout from the earliest design stage so that service corridors, meter locations, and connection points can be placed without disrupting operations. Retrofitting utility connections after stall placement is finalized is one of the most common and costly errors in market redevelopment projects.<\/p>\n<p>Key utility and service considerations include:<\/p>\n<ul>\n<li><strong>Water supply and drainage:<\/strong> <a href=\"https:\/\/id.scribd.com\/doc\/263485268\/SNI-8152-2015-Pasar-Rakyat\" target=\"_blank\" rel=\"noindex nofollow\">General planning practice requires drainage channels to be covered with grates for easy cleaning, have proper slope to prevent water pooling, and prohibits stalls or kiosks from being built over drainage channels<\/a>. Drainage must handle wash water and rainfall together. Correcting crossfall and adding trapped gullies can reduce standing water, cut odor complaints, and improve customer footfall.<\/li>\n<li><strong>Waste management:<\/strong> <a href=\"https:\/\/id.scribd.com\/doc\/263485268\/SNI-8152-2015-Pasar-Rakyat\" target=\"_blank\" rel=\"noindex nofollow\">General planning practice requires waterproof, covered, and easily lifted bins separated by organic\/inorganic and dry\/wet types, with waste transported at least once every 24 hours<\/a>. Collection times should align with trading hours rather than standard office schedules.<\/li>\n<li><strong>Electrical access:<\/strong> Managed metered outlets or shared utility points reduce reliance on unsafe extension cords, generators, charcoal, or liquefied petroleum gas. Approved equipment and cooking locations should be defined in the layout plan.<\/li>\n<li><strong>Loading bays and service corridors:<\/strong> Designated loading and unloading areas and improved drop-off points reduce congestion and improve pedestrian flow. Service corridors must be planned to avoid intersecting primary customer aisles.<\/li>\n<li><strong>Fire safety:<\/strong> <a href=\"https:\/\/id.scribd.com\/doc\/263485268\/SNI-8152-2015-Pasar-Rakyat\" target=\"_blank\" rel=\"noindex nofollow\">General planning practice requires evacuation routes, assembly points, fire extinguishers for all market types, and hydrants for Type I and II markets<\/a>. Fire exits, hydrants, suppression systems, and engineered drainage systems must be integrated into the layout.<\/li>\n<\/ul>\n<h2>Step-By-Step Planning Process For A Public Market Layout<\/h2>\n<ol>\n<li><strong>Conduct site analysis:<\/strong> Record site dimensions, access points, existing utilities, drainage gradients, and any structural constraints.<\/li>\n<li><strong>Consult stakeholders:<\/strong> Engage vendors, health inspectors, fire marshals, disability advocates, and local government departments before committing to a layout.<\/li>\n<li><strong>Define zoning layout:<\/strong> Establish wet and dry separation, food court placement, and service area locations based on drainage infrastructure and access points.<\/li>\n<li><strong>Plan circulation hierarchy:<\/strong> Designate main aisles, secondary aisles, and service corridors with widths that meet applicable standards for your market type and jurisdiction.<\/li>\n<li><strong>Allocate stall sizes by product type:<\/strong> Assign footprints based on operational requirements. Wet stalls need more space for drainage and display. Dry stalls can be more compact.<\/li>\n<li><strong>Map utility requirements:<\/strong> Coordinate water supply, drainage channels, electrical connection points, and waste collection areas with stall placement so no infrastructure conflicts arise.<\/li>\n<li><strong>Review against local regulations and accessibility standards:<\/strong> Verify compliance with applicable building codes, health regulations, fire safety requirements, and accessibility standards before finalizing the plan.<\/li>\n<\/ol>\n<h2>Case Study: Mercat Del Ninot, Barcelona<\/h2>\n<p>To see these principles applied, consider the Mercat del Ninot in Barcelona\u2019s Antiga Esquerra de l\u2019Eixample district. <a href=\"https:\/\/blog.esdemercado.com\/guia-del-mercat-del-ninot-que-comprar\" target=\"_blank\" rel=\"noindex nofollow\">The market, originally opened in 1933, underwent comprehensive rehabilitation and reopened in 2015<\/a>. The renovation demonstrates successful implementation of the zoning and circulation principles outlined in this guide.<\/p>\n<p><a href=\"https:\/\/barcelonaurbana.com\/en\/blog\/best-markets-barcelona\" target=\"_blank\" rel=\"noindex nofollow\">The renovation introduced modular steel and glass facades and is consistently rated for the quality of its meat and charcuterie stalls, heavily frequented by Eixample restaurant chefs sourcing quality produce<\/a>. <a href=\"https:\/\/blog.esdemercado.com\/guia-del-mercat-del-ninot-que-comprar\" target=\"_blank\" rel=\"noindex nofollow\">Reinforced access points, improved courtyards, energy efficiency upgrades, customer parking, and complementary services support efficient circulation and user satisfaction<\/a>.<\/p>\n<p><a href=\"https:\/\/blog.esdemercado.com\/guia-del-mercat-del-ninot-que-comprar\" target=\"_blank\" rel=\"noindex nofollow\">These improvements directly support a logical shopping route: shoppers can move from produce to fish to meat in a sequence that reflects the wet\/dry zoning hierarchy<\/a>. <a href=\"https:\/\/barcelonaurbana.com\/en\/blog\/best-markets-barcelona\" target=\"_blank\" rel=\"noindex nofollow\">El Ninot is one of the markets where locals actually shop, with very low tourist pressure<\/a>. This pattern shows how a layout can serve its primary user base rather than spectacle.<\/p>\n<h2>Common Mistakes To Avoid In Public Market Layout Plans<\/h2>\n<p>Several recurring mistakes appear across many public market projects, and they often relate to circulation, zoning, and utilities.<\/p>\n<ul>\n<li><strong>Inadequate aisle widths:<\/strong> Undersized aisles create dangerous bottlenecks during peak hours and may fail fire marshal or accessibility inspections.<\/li>\n<li><strong>Poor wet and dry separation:<\/strong> Mixing wet and dry zones creates contamination risks, drainage failures, and odor problems that affect the entire market.<\/li>\n<li><strong>Ignoring service access and loading bay requirements:<\/strong> Inadequate loading and unloading areas worsen congestion and disrupt pedestrian flow.<\/li>\n<li><strong>Insufficient planning for peak crowd flow and emergency evacuation:<\/strong> Markets must provide evacuation routes and assembly points sized for peak occupancy rather than average attendance.<\/li>\n<li><strong>Weak coordination between utility placement and stall allocation:<\/strong> Meter locations, drainage channels, and connection points placed after stall layouts are finalized often require expensive redesign.<\/li>\n<li><strong>Building stalls over drainage channels:<\/strong> General planning practice explicitly prohibits stalls or kiosks being built over drainage channels, yet this remains a common error in informal market expansions.<\/li>\n<\/ul>\n<h2>How To Create Your Public Market Layout Plan Efficiently<\/h2>\n<p>Once you understand the zoning, circulation, stall sizing, and utility requirements, the next step is choosing a tool that keeps every element to scale and easy to share. A collaborative, map-based platform makes this process faster and more reliable than static drawings.<\/p>\n<p>OnePlan is a browser-based, drag-and-drop platform where planners place stalls, barriers, service corridors, and utility markers onto a live satellite or street map, with everything staying accurately to scale as they zoom. It requires no CAD expertise and avoids static PDFs that circulate by email. Municipal planners, architects, health inspectors, and fire marshals can all work from the same live plan.<\/p>\n<p>The crowd capacity calculator lets planners outline any zone, such as a food court seating area or a main aisle during peak hours, and instantly validate safe standing occupancy. The Bill of Quantities automatically generates an exportable inventory of every object placed on the map, turning the finished layout into a procurement and permitting document without re-keying a single figure. OnePlan has powered <strong>200,000 events in 150 countries<\/strong>, from local community fairs like <a href=\"https:\/\/www.oneplan.io\/case-studies\/how-the-shalford-great-fair-gets-4x-faster-planning-in-oneplan\/\" target=\"_blank\">The Great Fair of Shalford<\/a> to large-scale festivals like the <a href=\"https:\/\/www.oneplan.io\/case-studies\/the-national-cherry-festival-planning-for-600000-attendees-in-oneplan\/\" target=\"_blank\">National Cherry Festival<\/a>, which plans for 600,000 attendees. Local governments including <a href=\"https:\/\/www.oneplan.io\/case-studies\/how-eagle-mountain-city-saves-70-planning-time-and-achieves-5x-roi-organizing-community-events-using-oneplan\/\" target=\"_blank\">Eagle Mountain City<\/a> have cut planning time by 70% using OnePlan as their single source of truth across departments.<\/p>\n<p><a href=\"https:\/\/www.oneplan.io\/book-demo\/\" target=\"_blank\"><strong>See how to-scale planning works for your market layout in a 15-minute OnePlan demo, or get started free with your first event.<\/strong><\/a><\/p>\n<h2>Conclusion<\/h2>\n<p>A successful public market layout plan rests on four pillars. These include deliberate zoning that separates wet, dry, ready-to-eat, and service functions. They also include circulation hierarchies that meet accessibility and emergency egress standards, stall dimensions calibrated to product type and operational requirements, and utility infrastructure coordinated with spatial layout from the outset.<\/p>\n<p>The dimensional standards and zoning principles in this guide, drawn from SNI 8152:2015, ADA Standards, and real-world examples like the Mercat del Ninot, provide a structured starting point for any market development or redevelopment project. Use this guide to draft, evaluate, or benchmark your layout, then confirm all requirements with your local planning authority, health department, and fire marshal.<\/p>\n<p>OnePlan provides a collaborative, to-scale platform to bring that plan to life, from the first zoning sketch to the final permitting export, on one live map that every stakeholder can see and act on.<\/p>\n<hr>\n<h2>Frequently Asked Questions<\/h2>\n<h3>What Is The Difference Between A Wet Market And A Dry Market In A Public Market Layout?<\/h3>\n<p>A wet market section handles perishable goods that require water, drainage, and washable surfaces, such as fish, seafood, poultry, fresh meat, and sometimes fresh produce. The term \u201cwet\u201d refers to the operational environment: these stalls are regularly washed down, generate liquid waste, and require covered drainage channels with proper slope. A dry market section handles goods that must be kept away from moisture, including packaged foods, grains, spices, clothing, crafts, and non-food items. In a well-designed public market layout, these two zones are physically separated by dedicated circulation routes, with wet zones positioned near drainage infrastructure and service entries, and dry zones positioned to protect merchandise from moisture and odor migration. Mixing the two zones creates contamination risks, drainage failures, and customer experience problems that are difficult to correct after construction.<\/p>\n<h3>What Aisle Width Is Required For Wheelchair Accessibility In A Public Market?<\/h3>\n<p>As noted in the aisle widths section, the ADA requires a 60-inch turning space and a 36-inch minimum clear width on accessible routes. <a href=\"https:\/\/mh-usa.com\/mobile-shelving\/ada-accessible-aisle-planning-mobile-shelving\" target=\"_blank\" rel=\"noindex nofollow\">Where an aisle is narrower than 60 inches, passing spaces must be provided at intervals of no more than 200 feet so two wheelchair users can pass each other<\/a>. These are federal minimums applicable in the United States, and requirements vary by jurisdiction, so always confirm with your local building authority and accessibility standards. In practice, main aisles in public markets are typically designed well above these minimums, at 13 to 16 feet (4 to 5 meters), to handle two-way foot traffic at peak hours. Accessibility compliance is most relevant to secondary aisles and service corridors.<\/p>\n<h3>How Many Stalls Can A Public Market Accommodate?<\/h3>\n<p>Stall count depends on total floor area, stall dimensions, aisle widths, utility infrastructure, and support facility requirements. There is no universal formula. The planning process works in reverse: start with the site area, subtract space for main aisles, secondary aisles, service corridors, administrative areas, restrooms, loading bays, and waste handling, then divide the remaining net trading area by the stall footprint appropriate for each product type. <a href=\"https:\/\/id.scribd.com\/doc\/263485268\/SNI-8152-2015-Pasar-Rakyat\" target=\"_blank\" rel=\"noindex nofollow\">SNI 8152:2015 classifies markets by trader count\u2014fewer than 250 (Type IV), 250 to 500 (Type III), 501 to 750 (Type II), and over 750 (Type I)\u2014with minimum corridor widths and facility requirements scaling accordingly.<\/a> A to-scale layout tool like OnePlan allows planners to test different stall configurations and aisle widths on the actual site footprint before committing to a design, which is significantly more reliable than spreadsheet estimates.<\/p>\n<h3>What Utility Infrastructure Does A Public Market Layout Need To Plan For?<\/h3>\n<p>A public market layout must coordinate five utility systems from the earliest design stage. These include water supply (with capacity calculated by user type and number, and periodic quality testing), drainage (covered channels with proper slope, no stalls built over them), liquid waste treatment (closed channels that do not pass through sales areas), electrical access (managed metered outlets for vendors, emergency lighting throughout), and solid waste management (segregated bins by organic\/inorganic and wet\/dry type, with collection at least once every 24 hours). Service corridors and loading bays must be planned to avoid intersecting primary customer circulation. Meter locations and connection points must be fixed before stall placement is finalized. As mentioned earlier, retrofitting utilities after the layout is set is a costly mistake in market construction and redevelopment.<\/p>\n<h3>Can OnePlan Be Used To Plan A Public Market Layout?<\/h3>\n<p>Yes. OnePlan is a browser-based, drag-and-drop platform where planners place stalls, barriers, service corridors, utility markers, and access points onto a live satellite or street map, with everything staying accurately to scale. It requires no CAD expertise and is free for your first event (up to 25 objects). Municipal planners, architects, health inspectors, and other stakeholders can all work from the same live plan simultaneously, which removes the version-control problems that come with emailed PDFs. The Bill of Quantities automatically generates an exportable inventory of every object placed on the map, supporting permitting and procurement. OnePlan\u2019s crowd capacity calculator allows planners to validate safe standing occupancy for any defined zone. Local governments and market organizers worldwide use OnePlan to plan, document, and share market layouts, from small community markets to large-scale public facilities.<\/p>\n<section data-read-next=\"true\">\n<h2>Read Next<\/h2>\n<ul>\n<li><a href=\"https:\/\/oneplan.io\/articles\/public-market-scale-layout\" target=\"_blank\">Public Market to Scale Layout: Plan Every Stall &amp; Aisle<\/a><\/li>\n<li><a href=\"https:\/\/oneplan.io\/articles\/public-market-collaborative-site-plan\" target=\"_blank\">How to Create a Public Market Collaborative Site Plan<\/a><\/li>\n<li><a href=\"https:\/\/oneplan.io\/articles\/public-market-crowd-flow-planning\" target=\"_blank\">Public Market Crowd Flow Planning: A 6-Step Guide<\/a><\/li>\n<li><a href=\"https:\/\/oneplan.io\/articles\/public-market-infrastructure-placement-map\" target=\"_blank\">How to Create a Public Market Infrastructure Placement Map<\/a><\/li>\n<li><a href=\"https:\/\/oneplan.io\/articles\/public-market-ingress-egress-plan\" target=\"_blank\">Public Market Ingress &amp; Egress Planning Guide<\/a><\/li>\n<\/ul>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Plan your public market layout with confidence. OnePlan helps you zone, size stalls, and design efficient markets. Start planning today!<\/p>\n","protected":false},"author":111,"featured_media":692,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-693","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/posts\/693","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/comments?post=693"}],"version-history":[{"count":0,"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/posts\/693\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/media\/692"}],"wp:attachment":[{"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/media?parent=693"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/categories?post=693"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/tags?post=693"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}