{"id":521,"date":"2026-08-12T05:05:12","date_gmt":"2026-08-12T05:05:12","guid":{"rendered":"https:\/\/www.oneplan.io\/articles\/coordinate-road-closures-permit"},"modified":"2026-08-12T05:05:12","modified_gmt":"2026-08-12T05:05:12","slug":"coordinate-road-closures-permit","status":"publish","type":"post","link":"https:\/\/www.oneplan.io\/articles\/coordinate-road-closures-permit","title":{"rendered":"How to Coordinate Road Closures with Local Authorities"},"content":{"rendered":"<p><em>Written by: Paul Foster, Founder, CEO, OnePlan<\/em><\/p>\n<h2 id=\"key-takeaways\">Key Steps for Faster Road-Closure Approvals<\/h2>\n<ul>\n<li>Most road-closure permit delays come from inaccurate or incomplete traffic control plans that force reviewers to request revisions and restart the approval clock.<\/li>\n<li>Accurate, to-scale mapping on a live platform lets planners validate detours, sign placement, and emergency access remotely, cutting site visits by up to 75% and saving hundreds of planning hours each year.<\/li>\n<li>Use a repeatable 7-step workflow: identify every jurisdiction, confirm lead times, build MUTCD-compliant plans, design viable detours, coordinate multi-agency sign-off in parallel, complete public notifications, and manage feedback from one version-controlled plan.<\/li>\n<li>Common rejection triggers such as plans not drawn to scale, missing elements, version conflicts, and insufficient lead time are preventable when every stakeholder works from the same live map.<\/li>\n<li>OnePlan turns this workflow into a repeatable advantage. <a href=\"https:\/\/www.oneplan.io\/book-demo\/\" target=\"_blank\">Book a 15-minute demo<\/a> to see how a single, to-scale plan accelerates approvals and procurement for every future event.<\/li>\n<\/ul>\n<h2>7-Step Process to Coordinate Road Closures and Secure Permits<\/h2>\n<p>This workflow applies to marathons, parades, cycling races, festivals, and any event that temporarily closes public roads. Requirements vary significantly by jurisdiction, so use every step as a framework and verify specifics with your local authority before you submit.<\/p>\n<ol>\n<li><strong>Identify every road authority with jurisdiction over your route.<\/strong> A single parade route can cross city streets, county roads, and state highways, <a href=\"https:\/\/ladmatrafficcontrol.com\/special-event-traffic-control-services\" target=\"_blank\" rel=\"noindex nofollow\">each with its own closure authority and approval process.<\/a> Map your full route first, then list every agency, including municipal public works, county DOT, state DOT, transit authority, and any federal land manager if applicable. Missing one jurisdiction is a common reason applications stall late in the process.<\/li>\n<li><strong>Confirm lead times and open applications early.<\/strong> Lead times vary widely by city and event type. Phoenix requires a minimum of 90 days for special event street closure applications. Brampton requires a letter of intent at least one year in advance for road races and marathons. Calgary\u2019s review window varies by impact level and the city recommends applying as early as possible. Open every application as soon as your event date is confirmed so you have room for corrections.<\/li>\n<li><strong>Build a to-scale traffic control plan that meets MUTCD standards.<\/strong> The MUTCD 11th Edition was adopted by a final rule effective January 18, 2024; the evidence does not address requirements for traffic control plans. Your plan must show advance warning signs, channelizing devices such as cones, barricades, and delineators, buffer zones, taper lengths, pedestrian and cyclist routing, flagging locations, and emergency access lanes, all drawn to scale. <a href=\"https:\/\/roadsafetyinc.net\/2026\/07\/traffic-control-plan-required-california\" target=\"_blank\" rel=\"noindex nofollow\">In California, for example, the CA MUTCD 2026 became effective January 18, 2026 and establishes current statewide standards<\/a>, which illustrates how state-level requirements layer on top of federal baselines. Always confirm the applicable standard with your jurisdiction.<\/li>\n<li><strong>Design a viable detour route and document it fully.<\/strong> <a href=\"https:\/\/clackamas.us\/engineering\/roadway290\" target=\"_blank\" rel=\"noindex nofollow\">The detour route must be capable of safely and legally accommodating the detoured traffic<\/a>. Check for one-way streets, weight-restricted bridges, school zones, and transit stops before you submit. Include a signing schedule that shows every required sign location along the diversion. <a href=\"https:\/\/cornwall.gov.uk\/transport-parking-and-streets\/street-works\/traffic-management-for-events-and-roadworks\" target=\"_blank\" rel=\"noindex nofollow\">Cornwall Council, for example, requires a signing schedule showing the closure, the approved diversion route, and the location of all required signs<\/a>. That level of detail is common in many authorities.<\/li>\n<li><strong>Coordinate multi-agency sign-off in parallel, not in sequence.<\/strong> Police, fire, EMS, transit, and public works each have independent review timelines. <a href=\"https:\/\/ashevillenc.gov\/department\/community-and-regional-entertainment-facilities\/outdoor-special-events\/public-property\/permit-applications\" target=\"_blank\" rel=\"noindex nofollow\">In Asheville, for example, outdoor special event permits involving street closures undergo joint review by Parks &amp; Recreation, Police, Fire, Risk Management, Transportation, Public Works, and the North Carolina DOT.<\/a> Share one live plan with all agencies at the same time so reviewers do not wait for each other\u2019s comments before they begin.<\/li>\n<li><strong>Complete public notification requirements.<\/strong> Most jurisdictions require written notice to affected residents and businesses before they issue a permit. <a href=\"https:\/\/hamilton.ca\/home-neighbourhood\/getting-around\/driving-traffic\/temporary-road-use-permits\" target=\"_blank\" rel=\"noindex nofollow\">Hamilton requires notice to affected property owners prior to the event.<\/a> <a href=\"https:\/\/highpeak.gov.uk\/article\/533\/Road-closure-orders\" target=\"_blank\" rel=\"noindex nofollow\">High Peak Borough Council requires road closure notices posted in affected streets before the event.<\/a> Treat notification deadlines as fixed milestones in your project timeline, not as afterthoughts.<\/li>\n<li><strong>Respond to reviewer feedback from a single, version-controlled plan.<\/strong> <a href=\"https:\/\/lcrig.org.uk\/2026\/06\/18\/the-permit-puzzle-how-to-navigate-the-local-authoritys-application-process\" target=\"_blank\" rel=\"noindex nofollow\">When a local authority challenges or returns a permit application due to inaccuracies, the approval clock restarts.<\/a> Keeping every stakeholder on one live plan means a correction made in response to one agency\u2019s feedback becomes immediately visible to all others. This approach removes the version-conflict problem that can turn a one-week fix into a three-week delay.<\/li>\n<\/ol>\n<p>This seven-step workflow becomes far easier to manage when your entire team works from a single, version-controlled plan that updates in real time. <a href=\"https:\/\/www.oneplan.io\/book-demo\/\" target=\"_blank\"><strong>Book a 15-minute demo to see OnePlan in action<\/strong><\/a> and watch how a to-scale, live plan turns this process into a repeatable workflow your whole team can run.<\/p>\n<figure style=\"text-align: center\"><video src=\"https:\/\/cdn.aigrowthmarketer.co\/1780508557928-19c9235d94fc.mp4\" style=\"max-height: 500px\" autoplay loop muted playsinline><\/video><figcaption><em>Build your event as a team inside OnePlan: design and manage any physical space on one integrated, live plan<\/em><\/figcaption><\/figure>\n<h2>Typical Lead Times by City or County<\/h2>\n<p>Lead-time requirements vary widely, so you need a clear benchmark before you build your schedule. The table below draws from publicly available permit guidance and is illustrative only. Always verify current requirements directly with the relevant authority before you plan your timeline.<\/p>\n<table>\n<thead>\n<tr>\n<th>Jurisdiction<\/th>\n<th>Event Type<\/th>\n<th>Minimum Lead Time<\/th>\n<th>Source<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Phoenix, AZ (USA)<\/td>\n<td>Festivals, runs, walks, parades<\/td>\n<td><a href=\"https:\/\/phoenix.gov\/administration\/departments\/streets\/requests-services\/temporary-requests\/right-of-way-management.html\" target=\"_blank\" rel=\"noindex nofollow\">90 days<\/a><\/td>\n<td>City of Phoenix<\/td>\n<\/tr>\n<tr>\n<td>San Francisco, CA (USA)<\/td>\n<td>Large special events<\/td>\n<td><a href=\"https:\/\/www.sf.gov\/get-a-permit-to-close-a-street-for-a-special-event\" target=\"_blank\" rel=\"noindex nofollow\">at least 6 months in advance (suggested)<\/a><\/td>\n<td>SFMTA \/ ISCOTT<\/td>\n<\/tr>\n<tr>\n<td>Austin, TX (USA)<\/td>\n<td>Large multi-day closures<\/td>\n<td><a href=\"https:\/\/services.austintexas.gov\/edims\/document.cfm?id=291499\" target=\"_blank\" rel=\"noindex nofollow\">up to 30 days (or 30+ for major corridors)<\/a><\/td>\n<td>Austin Office of Special Events<\/td>\n<\/tr>\n<tr>\n<td>Portland, OR (USA)<\/td>\n<td>Street\/lane closures<\/td>\n<td><a href=\"https:\/\/www.portland.gov\/transportation\/permitting\/apply-renew-or-change-temporary-street-use-permit\" target=\"_blank\" rel=\"noindex nofollow\">typically within 5-10 business days<\/a><\/td>\n<td>Portland TSUP<\/td>\n<\/tr>\n<tr>\n<td>Calgary, AB (Canada)<\/td>\n<td>High-impact closures<\/td>\n<td><a href=\"https:\/\/calgary.ca\/roads\/permits\/street-use.html\" target=\"_blank\" rel=\"noindex nofollow\">varies by impact level<\/a><\/td>\n<td>City of Calgary<\/td>\n<\/tr>\n<tr>\n<td>Brampton, ON (Canada)<\/td>\n<td>Road races, marathons, parades<\/td>\n<td><a href=\"https:\/\/brampton.ca\/EN\/residents\/Roads-and-Traffic\/Permits-and-Applications\/Pages\/Special-Event-Road-Closures.aspx\" target=\"_blank\" rel=\"noindex nofollow\">1 year (letter of intent)<\/a><\/td>\n<td>City of Brampton<\/td>\n<\/tr>\n<tr>\n<td>Hamilton, ON (Canada)<\/td>\n<td>Full road closure events<\/td>\n<td><a href=\"https:\/\/hamilton.ca\/home-neighbourhood\/getting-around\/driving-traffic\/temporary-road-use-permits\" target=\"_blank\" rel=\"noindex nofollow\">2 weeks minimum<\/a><\/td>\n<td>City of Hamilton<\/td>\n<\/tr>\n<tr>\n<td>High Peak (UK)<\/td>\n<td>Carnivals, marathons, festivals<\/td>\n<td><a href=\"https:\/\/highpeak.gov.uk\/article\/533\/Road-closure-orders\" target=\"_blank\" rel=\"noindex nofollow\">12 weeks<\/a><\/td>\n<td>High Peak Borough Council<\/td>\n<\/tr>\n<tr>\n<td>Cornwall (UK)<\/td>\n<td>Events requiring TTRO<\/td>\n<td><a href=\"https:\/\/cornwall.gov.uk\/transport-parking-and-streets\/street-works\/traffic-management-for-events-and-roadworks\" target=\"_blank\" rel=\"noindex nofollow\">12 weeks<\/a><\/td>\n<td>Cornwall Council<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Large public events such as marathons, community festivals, or parades often require several weeks or months for permit approval. Treat the minimum notice period as a hard deadline, not a target, and apply early so you have a buffer for corrections.<\/p>\n<h2>MUTCD-Compliant Traffic Control Plan Checklist<\/h2>\n<p>Most traffic control plans for event-related road closures in the United States include the elements below. Requirements vary by state and municipality, so verify against the applicable MUTCD edition and your local authority\u2019s standards before you submit.<\/p>\n<ul>\n<li>Project location, event dates, hours, and phases<\/li>\n<li>Existing roadway conditions and affected travel lanes<\/li>\n<li>Proposed lane or shoulder closures, traffic shifts, and detour routes<\/li>\n<li>Advance warning signs, including placement, spacing, and retroreflectivity per <a href=\"https:\/\/mutcd.fhwa.dot.gov\/\" target=\"_blank\" rel=\"noindex nofollow\">FHWA MUTCD Part 6<\/a><\/li>\n<li>Channelizing devices such as cones, barricades, delineators, and arrow boards<\/li>\n<li>Buffer zones and taper lengths between advance warning and work areas<\/li>\n<li>Flagging locations and flagger signaling procedures<\/li>\n<li>Pedestrian and cyclist routing with accessible detour paths<\/li>\n<li>Emergency vehicle access lanes, with minimum clear path verified locally<\/li>\n<li>Business and residential access provisions<\/li>\n<li>24-hour site contact information<\/li>\n<li>Scale, north arrow, street names, and legend on every plan sheet<\/li>\n<li>Engineer\u2019s stamp where required by jurisdiction<\/li>\n<\/ul>\n<h2>Multi-Agency Sign-Off Checklist<\/h2>\n<p>Road closure permits for events usually require coordination across several agencies. Work through this checklist in parallel so you avoid sequential delays.<\/p>\n<ul>\n<li><strong>Municipal public works or transportation department:<\/strong> primary permit authority for city streets, including application form, fee, and required attachments<\/li>\n<li><strong>State DOT:<\/strong> required if your route touches a state highway or arterial road<\/li>\n<li><strong>Local law enforcement:<\/strong> sign-off on road closure points, intersection control, and the crowd management plan<\/li>\n<li><strong>Fire department:<\/strong> review of emergency access lanes, hydrant clearances, and evacuation routes<\/li>\n<li><strong>EMS \/ emergency management:<\/strong> confirmation that medical access and staging locations appear on the plan<\/li>\n<li><strong>Transit authority:<\/strong> early notification if closures affect bus or rail routes<\/li>\n<li><strong>Utility companies:<\/strong> confirmation that no conflicts exist with underground infrastructure along the closure zone<\/li>\n<li><strong>Federal land manager:<\/strong> required if the route crosses National Park Service or other federal land<\/li>\n<li><strong>Public notification:<\/strong> written notice to affected residents and businesses, posted road closure notices, and any required newspaper publication<\/li>\n<li><strong>Insurance:<\/strong> certificate of general liability naming the relevant authority as additionally insured, with <a href=\"https:\/\/howlongfor.com\/government\/get-a-street-closure-permit\" target=\"_blank\" rel=\"noindex nofollow\">coverage of $1\u20132 million commonly required<\/a>. Confirm the exact requirement with each agency.<\/li>\n<\/ul>\n<h2>Common Rejection Reasons and How to Fix Them<\/h2>\n<p>Most permit rejections are preventable, and you can address the most frequent causes with a few targeted fixes.<\/p>\n<p><strong>Plan not drawn to scale.<\/strong> Reviewers cannot assess whether a detour works, whether emergency access is maintained, or whether sign spacing meets MUTCD standards if the plan is not to scale. Fix: build your plan on a live satellite or street map where every object, including barriers, cones, signage, and access lanes, appears at its real-world size. The <a href=\"https:\/\/www.oneplan.io\/case-studies\/events-and-safety-how-stadium-managed-traffic-for-one-of-the-uks-biggest-events-in-oneplan\/\" target=\"_blank\">Stadium team reduced eight traffic management maps from a full day in CAD to about two hours<\/a> by using OnePlan\u2019s click-and-drop tools, producing permit-ready outputs faster without specialist software.<\/p>\n<figure style=\"text-align: center\"><video src=\"https:\/\/cdn.aigrowthmarketer.co\/1780620742263-da4d8c03cc17.mp4\" style=\"max-height: 500px\" autoplay loop muted playsinline><\/video><figcaption><em>With OnePlan, you can place barriers, tents, and more inside its integrated, live planning tool<\/em><\/figcaption><\/figure>\n<p><strong>Detour route fails in practice.<\/strong> <a href=\"https:\/\/help.myworksites.co.nz\/en\/articles\/13872914-tips-for-faster-permit-approvals\" target=\"_blank\" rel=\"noindex nofollow\">Detour plans that fail due to one-way streets, weight-restricted bridges, or school zones are a common cause of TMP-related permit pushback.<\/a> Fix: trace your detour on a live map before submission to catch conflicts. Confirm that the route can legally and safely carry the diverted traffic volume.<\/p>\n<p><strong>Missing or incomplete elements.<\/strong> <a href=\"https:\/\/help.myworksites.co.nz\/en\/articles\/13872914-tips-for-faster-permit-approvals\" target=\"_blank\" rel=\"noindex nofollow\">Missing or incomplete traffic management plans, vague location descriptions, and failure to identify road classification or traffic impacts are common reasons applications are returned.<\/a> Fix: use the MUTCD checklist above as a pre-submission review. Include street names, a north arrow, a legend, a scale indicator, and 24-hour contact information on every plan sheet.<\/p>\n<p><strong>Version conflicts between agencies.<\/strong> As noted in step 7, version mismatches reset the approval clock and create confusion. Fix: share one live plan via a view-only link so every agency always sees the latest version. The <a href=\"https:\/\/www.oneplan.io\/case-studies\/how-the-north-texas-tribute-jam-saved-110-hours-planning-time-thanks-to-oneplan\/\" target=\"_blank\">North Texas Tribute Jam found that sharing detailed plans for roadblocks, crowd control, and traffic management with the City of Lewisville\u2019s Health and Safety Department meant approvals came quickly and without headaches.<\/a><\/p>\n<p><strong>Insufficient lead time.<\/strong> Submitting close to the minimum deadline leaves no room for a correction cycle. Fix: apply as early as possible, ideally at least double the stated minimum, and treat the first submission as the start of a dialogue rather than a one-shot approval.<\/p>\n<p><a href=\"https:\/\/www.oneplan.io\/book-demo\/\" target=\"_blank\"><strong>See how OnePlan eliminates these rejection triggers.<\/strong><\/a> Build your traffic control plan on a live, to-scale map and share it with every agency from one link so reviewers stay aligned.<\/p>\n<h2>Public-Notification Requirements for Road Closures<\/h2>\n<p>Public notification usually appears as a permit condition in most jurisdictions, not as an optional courtesy. Requirements vary, but the elements below appear consistently across city and county permit guidance.<\/p>\n<p>Resident and business notification typically requires written notice delivered in person, electronically, or by posted notice to all addresses directly affected by the closure. <a href=\"https:\/\/ashevillenc.gov\/department\/community-and-regional-entertainment-facilities\/outdoor-special-events\/public-property\/permit-applications\" target=\"_blank\" rel=\"noindex nofollow\">Asheville requires documented notification to impacted addresses as part of any road-closure application, with organizers able to use the city\u2019s Street Closure Notification Form or provide their own proof of delivery.<\/a><\/p>\n<p>Beyond individual notification, posted road closure notices must appear in the affected streets and surrounding area before the event to alert passing traffic. <a href=\"https:\/\/highpeak.gov.uk\/article\/533\/Road-closure-orders\" target=\"_blank\" rel=\"noindex nofollow\">High Peak Borough Council requires notices posted before the event<\/a>, which reflects the advance-posting windows many authorities impose.<\/p>\n<p>For closures with broader community impact, some jurisdictions add a third layer through newspaper publication or a formal public objection period. <a href=\"https:\/\/www.otodc.govt.nz\/council-services\/roads-and-streets\/temporary-road-closures\" target=\"_blank\" rel=\"noindex nofollow\">Waikato District Council must publicly notify proposed temporary road closures under Schedule 10 of the Local Government Act 1974 to allow objections before approval<\/a>. If objections arise, the applicant may need to revise plans or conduct further consultation.<\/p>\n<p>Emergency services notification sits alongside resident notification as a separate requirement. Confirm with your local fire and EMS agencies whether they require direct written notice in addition to their permit review sign-off.<\/p>\n<p>Build every notification deadline into your project timeline as a hard milestone. A permit that clears agency review can still be delayed if notification documentation is not filed on time.<\/p>\n<h2>Frequently Asked Questions<\/h2>\n<h3>How far in advance should I apply for a road closure permit for a marathon or parade?<\/h3>\n<p>You should apply as early as possible and always earlier than the stated minimum. Lead times range from as few as 5 business days for lower-impact closures in some Canadian cities to a full year for road races in jurisdictions like Brampton, Ontario. Large U.S. cities commonly require 90 days to 6 months for events such as marathons and festivals. Treat the minimum as a hard deadline, not a target, and apply early enough to complete at least one full correction cycle without compressing your event preparation timeline.<\/p>\n<h3>How do I identify every agency that needs to sign off on my road closure?<\/h3>\n<p>Start by mapping your full route and identifying every road type it crosses, including city streets, county roads, state highways, and any federal or park land. Each road type has its own jurisdiction and approval authority. For city streets, that authority is typically the municipal transportation or public works department. State highways require the relevant state DOT. Any route touching transit infrastructure requires early coordination with the transit authority. Police and fire departments review independently of the road authority. For events crossing multiple jurisdictions, list every agency before you open a single application and confirm lead times with each one separately.<\/p>\n<h3>What documentation is most commonly required in a road closure permit application?<\/h3>\n<p>Most jurisdictions require a traffic control plan drawn to scale, a site map or route map, a detour plan with a signing schedule, a certificate of general liability insurance naming the relevant authority as additionally insured, a public notification plan, and an emergency access plan. Some jurisdictions also require an engineer\u2019s stamp on the traffic control plan, particularly for complex or high-volume closures. Requirements vary significantly, so download the specific checklist from the permit authority\u2019s website and confirm whether any elements have changed since your last application.<\/p>\n<h3>Does my traffic control plan need to be prepared by a licensed engineer?<\/h3>\n<p>The answer depends on the jurisdiction and the complexity of the closure. Many cities accept standard or typical plans for straightforward, lower-impact event closures without requiring an engineer\u2019s stamp. Others, particularly for closures on arterial roads or state highways, require a plan prepared and stamped by a licensed professional engineer. California, Texas, and several other states have specific stamping requirements for encroachment permits and special events in the public right-of-way. Check with the permit authority before you invest in engineering services or assume you do not need them.<\/p>\n<h3>How does accurate mapping reduce the number of site visits needed before an event?<\/h3>\n<p>A to-scale plan on a live satellite or street map lets you measure distances, validate sign spacing, check detour feasibility, and confirm infrastructure placement from your desk before anyone drives to the site. The <a href=\"https:\/\/www.oneplan.io\/case-studies\/beirut-marathon-planning-streamlined-with-oneplan-seeing-a-75-decrease-in-site-visits\/\" target=\"_blank\">Beirut Marathon cut around 20 pre-event site visits a year down to two<\/a> after switching to to-scale planning in OnePlan. The Tour of Britain reduced site visits by 75% across an 8-stage, 1,352-mile national race. Fewer site visits mean less time, lower fuel cost, and fewer last-minute discoveries that force permit revisions. The plan handles much of the reconnaissance work that previously required boots on the ground.<\/p>\n<figure style=\"text-align: center\"><img decoding=\"async\" src=\"https:\/\/cdn.aigrowthmarketer.co\/1780620510054-c5429587ebad.png\" alt=\"Festival planning example inside OnePlan: the base layer is a zoomable satellite or street map, and everything placed on it (tents, stages, crowd barriers, toilets, vehicles, staff, signage, routes) stays accurately to scale as you zoom\" style=\"max-height: 500px\" loading=\"lazy\"><figcaption><em>Festival planning example inside OnePlan: the base layer is a zoomable satellite or street map, and everything placed on it (tents, stages, crowd barriers, toilets, vehicles, staff, signage, routes) stays accurately to scale as you zoom<\/em><\/figcaption><\/figure>\n<h2>Turn Road-Closure Planning into a Repeatable Advantage<\/h2>\n<p>Every road closure permit application can become a reusable asset for future events. A to-scale plan that satisfies one year\u2019s permit review, complete with advance warning sign placements, channelizing device locations, detour routes, and emergency access lanes, becomes the starting point for next year\u2019s application. Update the dates, adjust for any route changes, and you submit a plan that reviewers already recognize instead of starting from scratch.<\/p>\n<p>The auto-generated Bill of Quantities turns that same plan into a procurement document. Draw your barrier lines and cone runs, and OnePlan tells you exactly how many segments to order. <a href=\"https:\/\/www.oneplan.io\/case-studies\/events-and-safety-how-stadium-managed-traffic-for-one-of-the-uks-biggest-events-in-oneplan\/\" target=\"_blank\">Stadium coordinated 400 individual road closures across 7 procession routes and 110 stakeholders for Coventry Moves<\/a> using OnePlan\u2019s point-and-click tools. The team reduced sign placement from 5\u201310 minutes per sign to under a minute and cut eight traffic management maps from a full day in CAD to two hours.<\/p>\n<p>One live plan that every agency can view, one set of measurements that feeds both the permit application and the supplier order, and a workflow that gets faster every time you run it together create a repeatable advantage for every event. <a href=\"https:\/\/www.oneplan.io\/book-demo\/\" target=\"_blank\"><strong>Book a 15-minute demo<\/strong><\/a> to see how this repeatable workflow accelerates every future event, with your first plan free.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Get road closure permits approved faster. OnePlan helps you build MUTCD-compliant plans and coordinate multi-agency sign-offs from one live platform.<\/p>\n","protected":false},"author":111,"featured_media":520,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-521","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/posts\/521","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/comments?post=521"}],"version-history":[{"count":0,"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/posts\/521\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/media\/520"}],"wp:attachment":[{"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/media?parent=521"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/categories?post=521"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oneplan.io\/articles\/wp-json\/wp\/v2\/tags?post=521"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}